How to install stainless steel and glass railings?Embedded bottom plate. Device embedded parts(Add embedded parts later)The installation of the embedded parts for railings generally can only adopt the method of adding embedded parts later. The main approach is to use contraction bolts and steel plates to manufacture a post-connected joint, which can be laid out on the civil construction base first.
Then, determine the position of the column fixation points. Then, drill holes in the air with an impact drill, and install the contraction bolts. Keep the bolts to a sufficient length. After the bolts are positioned, tighten them and weld the nuts and screws together to prevent the nuts and steel plates from loosening.
The connection between the handrail and the wall surface also adopts the above-mentioned method. Lay out the lines. When installing embedded parts, certain errors may occur. Therefore, before the column is installed, the layout must be re-laid. If there is any deviation, it should be corrected in time.
It should be ensured that all the stainless steel columns are located on the steel plates and can be welded around them. Weld the column. When stopping the installation of the column and welding the column, two people need to cooperate. One person should hold the steel pipe to keep it vertical and prevent it from shaking during welding. The other person should weld around it and it should comply with the welding standards.